The Baseline Escape Premium T-Shirt | Project Manager

Price range: $37.99 through $40.99

Add to Cart
Baseline Escape Project Manager Shirt | PM Humor | CADShirts
The Baseline Escape Premium T-Shirt | Project Manager
$37.99 – $40.99Price range: $37.99 through $40.99
  • Premium minimalist resort-style typography.
  • Perfect for worn-out project managers and engineers.
  • Fit: Modern retail fit (slightly tailored). Order +1 size for a relaxed, roomy fit.

Shipping calculated at checkout.


Premium Quality

Secure Checkout

Tracked Delivery

Anatomy of the Garment

The Blueprint:

Every project manager knows the feeling, and this baseline escape project manager shirt was made for it. The Gantt chart is loaded with red critical paths, the scope creep is real, and all you want is a one-way ticket to zero float. The Baseline Escape design captures that exact sentiment.

Designed with the clean, minimalist aesthetic of high-end resort apparel, this graphic swaps out tropical destinations for the ultimate project management fantasy: Project Closeout. Featuring crisp, center-aligned typography with a subtle arched “Mentally At” and a sharp five-point star acting as your critical milestone, this Premium T-Shirt is the perfect uniform for your next status meeting. Whether you are dealing with RFIs, submittals, or endless stakeholder revisions, this subtle, cynical design lets everyone know where your head is truly at.

This baseline escape project manager shirt is a premium piece of gear built for the planners, schedulers, and controllers who keep the job site running.

Specifications:

  • Base Model: Premium Bella+Canvas 3001 Unisex Jersey Tee.
  • Material: Solid colors are 100% premium Airlume combed and ring-spun cotton. (Note: Ash – 99% Airlume combed and ring-spun cotton / 1% polyester; Heather blends contain up to 48% polyester).
  • Fabric Weight: Lightweight 4.2 oz/yd² (142 g/m²).
  • Construction: Engineered with side-seamed construction, ensuring the garment aligns with natural human anatomy and preventing the shirt from twisting or torquing after repeated washing.
  • Collar & Shoulders: Features a highly resilient ribbed knit crew-neck collar that snaps back into place, paired with shoulder-to-shoulder taping to prevent stretching under mechanical stress.
  • Tag: Tear-away label designed to minimize neck irritation.
  • Color Display: Due to individual monitor calibrations, device screen settings, and digital studio lighting, physical garment colors may vary slightly from on-screen mockups.

Care & Sustainability

  • Wash: Machine wash cold, inside out, on a gentle cycle with similar colors. Washing inside out protects the graphic from abrasive friction.
  • Detergent & Chemicals: Use a mild detergent. Do not use fabric softeners, as they deposit a chemical residue that rapidly degrades the water-based ink. Use non-chlorine bleach only when absolutely necessary.
  • Dry: Hang-dry for the absolute longest lifespan, or tumble dry on the lowest possible heat setting. High heat will cause the cotton to shrink and the ink to crack.
  • Iron: If ironing is necessary, iron inside-out on a cool setting. Never iron directly over the printed graphic.
  • Dry Cleaning: Do not dry clean. The harsh chemical solvents used in dry cleaning will irreparably destroy the print.
  • Ethical Manufacturing: Printed in the USA on globally sourced blanks. Manufactured in W.R.A.P. Platinum certified, Fair Labor accredited facilities utilizing solar power, bluesign® approved non-hazardous dyes, and 7x less water than the industry average.

Shipping, Customs & Returns

Shipping Timelines

  • Production: 3 to 6 Business Days
  • US Transit: 4 to 9 Business Days (Total Estimate: 7 to 15 Business Days)
  • Canada Transit: 5 to 14 Business Days (Total Estimate: 8 to 20 Business Days)

Shipping Methods & Address Restrictions: All orders are shipped via standard shipping services. We currently do not offer express or expedited shipping. Please note that our carriers cannot deliver to P.O. Boxes or military (APO/FPO) addresses.

Global Fulfillment & Canadian Customs To ensure the most efficient delivery, your made-to-order apparel is routed to the fulfillment facility closest to your location. However, based on specific size and color inventory, some Canadian orders may be manufactured in and shipped from our United States facilities. Please note that Canadian shipments may occasionally be subject to import duties or provincial taxes (GST/HST) assessed by customs authorities upon arrival. Any such import charges are strictly the responsibility of the recipient.

Returns & Exchanges

Because every CADShirts item is custom-printed specifically for your order, we cannot accept returns or exchanges for sizing issues or buyer’s remorse. We offer a strict 21-day replacement policy for any manufacturing defects or transit damage. Please review the sizing chart carefully before ordering.

For complete details, please review our Shipping Policy and Return & Refund Policy.

Reviews

There are no reviews yet.

Only logged in customers who have purchased this product may leave a review.