Only logged in customers who have purchased this product may leave a review.
Gantt All The Time Hoodie | Project Manager
$59.99 – $68.99Price range: $59.99 through $68.99
Retro Jack-Up Rig Classic T-Shirt | Offshore Operations
$32.99 – $36.99Price range: $32.99 through $36.99
Gantt All The Time Classic T-Shirt | Project Manager
$32.99 – $36.99Price range: $32.99 through $36.99
Premium Quality
Secure Checkout
Tracked Delivery
Anatomy of the Garment
Anatomy of the Garment
The Blueprint:
Every project manager knows this Coffee Mugs Project Manager T-Shirt speaks the truth: the critical path is built on caffeine and a meticulously updated baseline. The Gantt All The Time Classic T-Shirt captures the reality of project controls with the bold phrase “GANTT ALL THE TIME” and “Manage scope. Occasionally”. This design features a vintage, distressed graphic of two coffee mugs connected like cherries, heavily patterned with blocky Gantt chart segments and schedule grids.
It is a humorous, deeply technical nod to the project management profession, designed specifically for engineers and schedulers who live their lives in Primavera P6 and MS Project.
Whether you are fighting scope creep, running a variance analysis, or crashing the schedule to meet an impossible deadline, this Coffee Mugs Project Manager T-Shirt speaks your exact language. The retro aesthetic brings an industrial, trade manual vibe to your daily wardrobe. It is a solid, reliable choice for the corporate office, the construction job site, or those late-night baseline updates.
Specifications:
- Base Model: Gildan 64000 Adult Softstyle T-Shirt.
- Material: Solid colors are 100% ring-spun cotton, creating a superior, smooth canvas for crisp graphic rendering. (Please note: Sport Grey contains 90% cotton / 10% polyester, and all Heather colors contain 65% polyester / 35% cotton).
- Fabric Weight: Lightweight 4.5 oz/yd² (153 g/m²) fabric, providing highly breathable, all-day comfort without sacrificing durability.
- Construction: Tubular body construction ensures there are no itchy side seams to cause friction.
- Collar & Shoulders: Features a seamless, narrow-width ribbed collar that retains its shape, paired with taped neck and shoulders for lateral structural stability.
- Stitching: Resilient double-needle stitching on the sleeves and bottom hem prevents unraveling under stress.
- Tag: Tear-away label guarantees a scratch-free neckline.
- Color Display: Due to individual monitor calibrations, device screen settings, and digital studio lighting, physical garment colors may vary slightly from on-screen mockups.
Care & Sustainability
Care & Sustainability
- Wash: Machine wash cold (maximum 30°C/86°F), inside out, on a gentle cycle with similar colors. Always turning the shirt inside out before washing is the single most important step to protect the graphic from destructive friction against the washing machine agitator.
- Detergent & Chemicals: Use a mild detergent. Do not use fabric softeners, as the chemical lubricants will actively degrade the print adhesives and cause cracking. Do not use bleach.
- Dry: Hang drying is highly recommended to maximize the lifespan of the print. If time constraints require a machine, tumble dry on the lowest possible heat setting.
- Iron: If ironing is required to remove wrinkles, use a cool iron with the garment turned inside out. Never apply heat directly to the printed design.
- Dry Cleaning: Do not dry clean.
- Ethical Manufacturing: The base garment is OEKO-TEX® STANDARD 100 certified, ensuring it is rigorously laboratory-tested and completely free of harmful substances. It is manufactured in WRAP-certified facilities dedicated to ethical labor practices.
- Initial Unboxing Note: Your shirt is freshly printed. You may notice a faint vinegar-like scent or slight residue upon unboxing; this is a harmless, temporary byproduct of the printing fixation process and will wash out completely in the first cold-water cycle.
Shipping, Customs & Returns
Shipping, Customs & Returns
Shipping Timelines
- Production: 3 to 6 Business Days
- US Transit: 4 to 9 Business Days (Total Estimate: 7 to 15 Business Days)
- Canada Transit: 5 to 14 Business Days (Total Estimate: 8 to 20 Business Days)
Shipping Methods & Address Restrictions: All orders are shipped via standard shipping services. We currently do not offer express or expedited shipping. Please note that our carriers cannot deliver to P.O. Boxes or military (APO/FPO) addresses.
Global Fulfillment & Canadian Customs To ensure the most efficient delivery, your made-to-order apparel is routed to the fulfillment facility closest to your location. However, based on specific size and color inventory, some Canadian orders may be manufactured in and shipped from our United States facilities. Please note that Canadian shipments may occasionally be subject to import duties or provincial taxes (GST/HST) assessed by customs authorities upon arrival. Any such import charges are strictly the responsibility of the recipient.
Returns & Exchanges
Because every CADShirts item is custom-printed specifically for your order, we cannot accept returns or exchanges for sizing issues or buyer’s remorse. We offer a strict 21-day replacement policy for any manufacturing defects or transit damage. Please review the sizing chart carefully before ordering.
For complete details, please review our Shipping Policy and Return & Refund Policy.
Related products
-
Project Management: The Critical Path, Hoodies
$59.99 – $68.99Price range: $59.99 through $68.99This product has multiple variants. The options may be chosen on the product page -
Project Management: The Critical Path, Classic T-Shirts
$32.99 – $36.99Price range: $32.99 through $36.99This product has multiple variants. The options may be chosen on the product page -
Project Management: The Critical Path, Classic T-Shirts
$32.99 – $36.99Price range: $32.99 through $36.99This product has multiple variants. The options may be chosen on the product page -
Project Management: The Critical Path, Hoodies
$59.99 – $68.99Price range: $59.99 through $68.99This product has multiple variants. The options may be chosen on the product page



Reviews
There are no reviews yet.